Hurricane Preparation for Elevators

Blog Hurricane Preparation for Elevators

Recent Posts

Archives

  • July 2018 (2)
  • June 2018 (1)
  • March 2018 (1)
  • May 2016 (1)
  • April 2016 (1)
  • March 2016 (1)
  • June 2015 (2)
  • January 2015 (1)
  • December 2014 (1)
  • September 2014 (2)
  • July 2014 (1)
  • June 2014 (1)
  • The 2014 Hurricane Season is here. To prepare your industrial rack and pinion elevator for hurricane conditions, one should take into account several factors. Is the elevator located within the expected flood plain or subject to expected flooding conditions? McDonough Elevators suggests the elevator be positioned above flood levels. In most cases, this would be at the second level but no higher than necessary to mitigate loads in high wind conditions. After the parking location is determined, power should be disconnected from the elevator. This ensures the elevator will not be used in adverse conditions nor returned to operation until a full inspection is conducted.